• +961 1 326726

  • info@brainbeirut.org

About Fiat Bridge Entrance

• Street Illumination and Electric Pole Installation

• Sidewalk and Wall Painting

• Sidewalk Cleaning

• Installing Cut Eyes for safety

• Raising welcome signs

 

Lead Time: 1 month and 15 days
Cost: $32,000





Image Gallery

© All Rights Reserved 2024