• +961 1 326726

  • info@brainbeirut.org

Our Projects

    • Street lighting
    • Street lighting

      Lead Time: 8 months

      Cost: $218,000

      THE "BRAIN BEIRUT" FOUNDATION COLLABORATED WITH SEVERAL PARTNERS TO EXECUTE ONE OF THEIR MOST SIGNIFICANT PROJECTS

      View Project
    • Tree afforestation
    • Tree afforestation

      Lead Time: 3 months

      Cost: $15,000

      The "Brain Beirut" Foundation, in collaboration with the Beirut Municipality, launched an extensive afforestation campaign.

      View Project
    • Painting the sidewalks
    • Painting the sidewalks

      Lead Time: 4 months

      Cost: $53,000

      Refurbishment and repainting of sidewalks by the "Brain Beirut" initiative.

      View Project
    • Rehabilitation of St. Georges Hospital (Roum) roundabout
    • Rehabilitation of St. Georges Hospital (Roum) roundabout

      Lead Time: 15 days

      Cost: $5,000

      Brain Beirut Association completely redesigned the roundabout by planting an olive tree surrounded by two hands model to protect it with the intention of sending a clear message "Achrafieh is green and shall remain so"

      View Project
    • Rehabilitation works beneath Sagesse Bridge
    • Rehabilitation works beneath Sagesse Bridge

      Lead Time: 15 days

      Cost: $10,600

      Brain Beirut Association lit up beneath bridge in a modern and artistic way. Dirty walls were painted and a large signboard was installed on which the traffic signs are displayed

      View Project
    • Rehabilitation of the Park leading to ABC Mall (Antoine Choueiri Str)
    • Rehabilitation of the Park leading to ABC Mall (Antoine Choueiri Str)

      Lead Time: 15 days

      Cost: $11,200

      After many years of neglect, the park was cleaned, weeded and restored. It is now bounded by a kids friendly fence built of colored pencils. The idea is an imitation with a Lebanese Touch.

      View Project
    • Rehabilitation of the garden at Hotel Dieu Hospital crossroad
    • Rehabilitation of the garden at Hotel Dieu Hospital crossroad

      Lead Time: One Month

      Cost: $23,200

      Brain Beirut Association cleaned and trimmed the garden and decorated it by a fence of metallic roses that are illuminated at night turning it from neglected spot to an attractive beauty scene.

      View Project
    • Light Up and Rehabilitation of MTV / Ashrafieh Tunnel
    • Light Up and Rehabilitation of MTV / Ashrafieh Tunnel

      Lead Time: One Month

      Cost: $19,200

      Brain Beirut Association in partnership with Lebanon of Tomorrow and UFS lit up the MTV Tunnel and painted the sidewalk and fixed all necessary illuminated traffic signs and public safety protection devices.

      View Project
    • Rehabilitation of Hay Al Siryan roundabout
    • Rehabilitation of Hay Al Siryan roundabout

      Lead Time: One Month

      Cost: $17,600

      Brain Beirut Association redesigned the roundabout that was covered by dried plants into a distinguished beauty spot. We encircled the trees by hand models sending a message entitled "protect the environment".

      View Project
    • Embellishing the crossroads of Mar Mitr / Sagesse
    • Embellishing the crossroads of Mar Mitr / Sagesse

      Lead Time: 15 days

      Cost: $9,600

      Brain Beirut Association embellished the important spot at Achrafieh by encircling the waste dumping ares and fixing the Google Location symbol. The idea is and imitation of a similar model found in New York.

      View Project
    • Rehabilitation of the Surveillance cameras of the Internal Security Forces
    • Rehabilitation of the Surveillance cameras of the Internal Security Forces

      Lead Time: 10 days

      Cost: $10,300

      Brain Beirut Association supplied the Surveillance system cameras of the ISF with 24h/7d electric power supply to register any traffic violation and reduce the frequency of various kinds of crimes.

      View Project
    • Hotel Dieu Entrance
    • Hotel Dieu Entrance

      Lead Time: 4 months

      Cost: $53,000

      Enhancing area entrance and infrastructure

      View Project
    • Ring entrance to Centre Sofil
    • Ring entrance to Centre Sofil

      Lead Time: 1 month

      Cost: $18,000

      Improving Safety and Accessibility

      View Project
    • Sodeco Entrance
    • Sodeco Entrance

      Lead Time: 1 month

      Cost: $32,000

      Urban Infrastructure and Remodeling Efforts

      View Project
    • Dekwaneh Bridge Entrance - Achrafiyeh
    • Dekwaneh Bridge Entrance - Achrafiyeh

      Lead Time: 4 months

      Cost: $53,000

      Enhancing Urban Infrastructure and Safety

      View Project
    • Fiat Bridge Entrance
    • Fiat Bridge Entrance

      Lead Time: 1 month and 15 days

      Cost: $32,000

      Urban Enhancement Initiatives

      View Project
    • Installation of an artistic Lebanesse Flag (Charles Helou Avenue)
    • Installation of an artistic Lebanesse Flag (Charles Helou Avenue)

      Lead Time: 1 month

      Cost: $2,500

      Brain Beirut Association installed a masterpiece executed by Artist Charles Nassar founder of Rimhala museum consisting of Metallic Lebanese Flag performed in a creative way confirming the attachment of Achrafieh to our country Lebanon

      View Project
    • Rehabilitation Karm El Zeitoun/ Highway
    • Rehabilitation Karm El Zeitoun/ Highway

      Lead Time: 2 months

      Cost: $15,000

      Brain Beirut Association cleaned and painted the sidewalks from both sides, tree pruning, weed the dry grass and replace the electric traffic signs for road safety.

      View Project
    • Upgrading and enhancement of traffic safety at Ashrafieh
    • Upgrading and enhancement of traffic safety at Ashrafieh

      Lead Time: 3 months

      Cost: $25,000

      Brain Beirut Association fixed around 5000 light reflectors ns cat eyes along with light alarms in an attempt to reeduce traffic accidents and erected slight bumps at some dangerous spots.

      View Project

© All Rights Reserved 2024