• +961 1 326726

  • info@brainbeirut.org

About Rehabilitation Karm El Zeitoun/ Highway

Brain Beirut Association cleaned and painted the sidewalks from both sides, tree pruning, weed the dry grass and replace the electric traffic signs for road safety.

Lead Time: 2 months
Cost: $15,000





Image Gallery

© All Rights Reserved 2024